Healthcare Facilities

Roper Hybrid OR

Project: Roper Hybrid OR
Client: Roper St Francis Hospital
Location: Roper St Francis Hospital
Duration: 6 Months
Completion Date: August 2016
Building Specs/Details: This project was an addition to an existing tower. Steel and brick needed to match the current building. Over 17 miles of conduit was required to make this room operable. The Artiz Zeego is one out of 208 robots installed across the US.  Room finishes included specialty flooring and Cupron Enhanced Corian Countertops to help deter the growth of bacteria. In addition to the OR proper there is a scrub area, a nursing station and a control room. 


10th Floor East Backfill Renovation

Project: 10th Floor East Backfill Renovation
Client: Medical University Hospital Authority
Location: Medical University of South Carolina
Duration: 8 Months
Completion Date: August 2010
Building Specs/Details: This project was a 13,000 square foot renovation. Upper floor was totally gutted in the middle of the hospital, which provided for twenty new patients rooms and staff facilities. The work included extensive demolition, cementitious floor leveling, cold formed metal framing, drywall, fireproofing, resilient sheet flooring (welded), acoustical ceiling, custom casework, medical gas, plumbing, fire sprinklers, mechanical, electrical, fire alarm and nurse call.


Children's Hospital 5th Floor Procedure Room 7 - 10 Renovation

Project: Children's Hospital 5th Floor Procedure Room 7 - 10 Renovation
Client: Medical University Hospital Authority
Location: MUHA Children's Hospital, Peninsular Charleston
Duration: 83 Days
Completion Date: July 2010
Building Specs/Details: Renovation of four existing Procedure Rooms, Waiting Area, Clean Utility Room and Storage Area.  Work included demolition, new partitions, ceiling, casework, flooring, painting, medical gas updgades and minor mechanical, electrical and fire protection as necessary.


Dental Medicine Teaching Lab Expansion

Project: Dental Medicine Teaching Lab Expansion
Client: Medical University of South Carolina
Location: 171 Ashley Avenue, Peninsular Charleston
Duration: 60 Days
Completion Date: July 2010
Building Specs/Details: Work included demolition, modifications, upgrades and renovations to the existing building 5th Floor Dental Lab Areas.  Provide new MEP system components to accomodate new laboratory spaces.  Work included architectural, electrical, plumbing and mechanical upgrades.


Interim Children's Emergency Department Renovations

Project: Interim Children's Emergency Department Renovations
Client: Medical Univeristy Hospital Authority
Location: Charleston, SC
Duration: 
Completion Date: November 14, 2008
Building Specs/Details: Construction of a 7,000 SF emergency facility for pediatric patients in an existing area of an operating hospital.  Work included selective demolition, strucutral framing, non-load bearing partitions, interior finishes, casework, medical equipment and new MEP sytems incuding medical gas, nurse call and fire alarm.


Library/Administration Building Renovation

Project: Library/Administration Building Renovation
Client: Medical University of South Carolina
Location: 171 Ashley Ave., Peninsular Charleston
Duration: 365 days
Completion Date: June 2004
Building Specs/Details: This project included the renovation of two-story, 34,000-square-foot building into classrooms and student areas. The project was complicated by the fact that the building was continually occupied by the University's Library throughout construction. 


MUSC PCICU Nursery Renovation

Project: MUSC PCICU Nursery Renovation
Client: MUSC
Location: 171 Ashley Ave., Peninsular Charleston
Duration: 270 days
Completion Date: May 2003
Building Specs/Details: Complete renovation of the 6,800-square-foot space to house a new unit, which included everything from exam rooms to a medical intensive care unit.


Psychiatric Institute - First Floor Water Damage Repairs

Project: Psychiatric Institute - First Floor Water Damage Repairs
Client: Medical University of South Carolina
Location: MUSC Institute of Psychiatry - Charleston, SC
Duration: 130 Calendar Days
Completion Date: August 6, 2009
Building Specs/Details: Water damage repairs including demolition of exisiting finishes and installation of new GWB Partitions, Acoustical Ceilings, Resilient Floor and Base, Painting, Aluminum Storefront Systems and removal / reinstallation of light fixtures.